Here are some more pictures of the oven's progress. We've just finished the roof and chimney and are hoping to have the building finished in the next few days. We are waiting on the fabrication of the firing doors, but as soon as they are complete we will build the first fire to start slowly curing the oven.


Its been tricky to photograph the oven face as the existing wall to the bakery is only 3 or so feet back from the oven.
As soon as the wall between the existing bakery and new space is down we will be able to have much better images. The facing was built with old recycled Drury bricks from Fairfax, with beautiful touches such as diffent courses of brick and a marble keystone above the door.
More to come soon.